The New Kompally | Road Expansion and New Flyover Work in Kompally |

Описание к видео The New Kompally | Road Expansion and New Flyover Work in Kompally |

-This video is about upcoming projects in kompally

♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
Hey all, Welcome to my channel. Thanks for looking at my videos. If you like my videos please consider subscribing.
♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
FOLLOW:
INSTAGRAM:   / laxman.pith.  .
TWITTER:   / laxman_travel  

Thank you for 63190+ subscribers
♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
Other videos:
Roads and Buildings of Hyderabad │ Jubilee Hills │ Part 1:
https://www.youtube.com/watch?v=g5E8X...
Buildings of Hyderabad:
https://www.youtube.com/watch?v=qyS6T...
Hyderabad Outer ring road:
https://www.youtube.com/watch?v=9P1eI...
♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥
Like, share and subscribe:
   / travelwithlaxman  
♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥♥

After a long wait, the expansion of the Kompally Highway (NH 44), which is one of the major road infrastructure projects taken up by the National Highways Authority of India (NHAI), has commenced.

Once the NHAI completes the work, motorists would get a huge relief as vehicular traffic has been increasing day-by-day from Suchitra circle to Dulapally X Roads. Since Kompally has become a commercial hub and is located on the Hyderabad-Nagpur Highway, the existing road network is inadequate to cater to the increasing traffic.

To address this, the NHAI has decided to carry out the road widening for a 10-km-long stretch from Suchitra to Kompally junction. It’s NHAI’s significant infrastructure project in Hyderabad as it would ease traffic flow towards Medchal, Kamareddy and Nizamabad.

The project, taken up at a cost of Rs 492 crore, is expected to be completed by 2024. At present, widening the road from the existing four-lane to six-lane on both sides is underway and authorities have put up barricades on the highway.

As part of the project, three elevated corridors will be built at Suchitra junction / Dairy Farm junction, Cine Planet/ Jeedimetla junction and Kompally junction/ Doolapally junction. The three cover a length of four km on the 10-km stretch.

The development is expected to give a major boost to infrastructure development in the northern corridor of Hyderabad. In a positive spin-off effect, commercial activity and real estate development have picked up pace in Kompally.

The Gateway IT Park being set up at Kandlakoya by the State government, which is expected to generate 10,000 jobs, will give a shot in the arm for the development in the area.

--Road expansion taken up on 10-km-long stretch from Suchitra to Kompally Jn
--It is being developed into six lanes from four lanes
--It is expected to be ready by 2024
--As part of expansion works, 3 elevated corridors would be built
Of the total 10 km stretch, flyovers will cover 4 km

Комментарии

Информация по комментариям в разработке