Скачать или смотреть Padma Bridge update (26-9-2016) ( টেকসই লোহার খাঁচা বসানো হচ্ছে পাইপের মধ্যে )

  • View Bangladesh
  • 2016-09-26
  • 21650
Padma Bridge update (26-9-2016) ( টেকসই লোহার খাঁচা বসানো হচ্ছে পাইপের মধ্যে )
bridgebridget jones babybridge over troubled waterbridget jones diary trailerbridge of spies trailerbridge to terabithiapadmapadma bridge bangladeshpadma bridgepadma bridge construction 2016padma bridge latest newspadma bridge songpadma shetu bangladeshBangladeshBridgeview Bangladeshpadma bridge in bangladeshpadma bridge updatepadma setupadma bridge update september
  • ok logo

Скачать Padma Bridge update (26-9-2016) ( টেকসই লোহার খাঁচা বসানো হচ্ছে পাইপের মধ্যে ) бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Padma Bridge update (26-9-2016) ( টেকসই লোহার খাঁচা বসানো হচ্ছে পাইপের মধ্যে ) или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Padma Bridge update (26-9-2016) ( টেকসই লোহার খাঁচা বসানো হচ্ছে পাইপের মধ্যে ) бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Padma Bridge update (26-9-2016) ( টেকসই লোহার খাঁচা বসানো হচ্ছে পাইপের মধ্যে )

» Pr-feasibility Study – 1998-1999 – GoB Fund
» Feasibility Study – 2003-2005 – JICA Grant
» Feasibility Study – 2003-2005 – JICA Grant
» LAP, RAP & EMP – 2006 – GoB Fund
» Detailed Design and procurement – 2009-2011 – ADB TA Loan
» Procurement & Implementation – 2011-2015 – GoB
» Estimated Project Cost (as per Final Design:
BDT 205072 Million or,
USD 2.972 Billion (Including VAT and IT)
» Land Acquisition : About 1100 hector
» Bridge in Brief
Main Bridge Length : 6.15 km
Viaduct : 3.148 km (Road), 532 m (Rail)
Approach Road : 12 km
River Training Works : 14 km (1.6 Mawa + 12.4 in Janjira) padma bridge view bangladesh padma bangladesh padma setu . latest news.
Span Total 41nos.
2 transition pier at landward ends and
40 Center pier
Span Length 150 m eachComposite Superstructure (Warren type Steel Truss Girder and Concrete on Upper Deck)
Total Lengh (Main Bridge) 41*150=6150 m = 6.150 km.Total 7 Nos Module:
6 span in each 6 module
5 span in one module
Pile Details
Racked (Inclined at 1H:6V) Steel Tubular driven pile
6 Nos. In each pier
Pile Diameter = 3m
Pile Length = 117m (near bank)
Pile Length = 101m (Centre)
Total number of pile in Main Bridge:
Steel Pile = 40*6 = 240 nos
vertical bored concrete pile = 2*12 = 24 nos (upto 80m depth)
Upper Deck
22 m wide concrete deck slab (2.5 m hard shoulder on the both side)
4 Lane road
Lower Deck Single Track Dual Gauge Rail
Deck Height 13.6 m
Navigational Clearance 18.30 m
Viaduct Mawa End (North Bank 19+20 = 39 Span; Length = 1478.03m
Janjira 23+19 = 42 Span; Length = 1670.03m
Total Road Viaduct (81 Span) = 3148.603m
Rail Viaduct 7+7 = 14 Span; Length = 532m
Utilities Through the Bridge
760mm dia Gas Transmission Line
150mm dia Fiber optical & Telephone Duct
7 nos High voltage Electric Line Platform in River over Pile Foundation. padma setu latest update. september

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]