Swiss Safety Systems: ZSI-90, DP on the Arosalinie, part 1/2 (Train Sim World | tutorial)

Описание к видео Swiss Safety Systems: ZSI-90, DP on the Arosalinie, part 1/2 (Train Sim World | tutorial)

Let's do the downhill tour from the mountain spa in Arosa to Chur station, this time in summer, while investigating the track magnet based safety system ZSI-90 that was in use on the Arosalinie until recently, as well as the deadman's pedal installed on the Ge 4/4 II locomotive of the Rhätische Bahn narrow gauge railway in Graubünden.

Full RhB passenger service from Arosa to Chur on the Ge 4/4 II electric locomotive in Rivet Games' Arosalinie DLC for Dovetail Games' Train Sim World 3, featuring short tutorials covering the safety systems used on the Ge 4/4 II RhB (36:13), the ZSI-90 system (40:40) and gradient signaling (57:35).

Also contained is a showcase of the stop on request signaling featured in the DLC.

My stream was automatically cut into two parts by Twitch.
This is part 1 of 2, find part 2 here:    • Swiss Safety Systems: ZSI-90, DP on t...  

Quick Access:
00:00 – Start
02:44 – Anniversary livery showcased
03:10 – Safety systems and setup of deadman's pedal on the Ge 4/4 II discussed
04:17 – Closeup on ZSI-90 (not ZBI-90) magnets
05:51 – Train stop (penalty brake) at signal at danger demonstrated
08:02 – Aspect display unit (ADU) for ZSI-90 shown
08:53 – Stop on request button in coaches showcased
11:47 – Closeup at signal showing "Geschwindigkeits-Ausführung 30 km/h" (green over yellow)
12:51 – Train stop (penalty brake) after deadman's pedal gets depressed
13:50 – Recovery from penalty brake
15:15 – Ge 4/4 II setup (fast)
16:34 – Starting train into decent, use of dynamic brake discussed
17:43 – Green lamp on lighting up at green distant signal, not at green main signal
20:54 – Passing Haspelgrube passing area
22:18 – Landscape discussed
22:50 – Name "Litzirüti" discussed
24:53 – Track/shadow rendering discussed
25:20 – Stop at Litzirüti with train from opposite direction waiting
26:08 – Stopping with dynamic brake and train brake
27:49 – Green light on clearing for departure signal box discussed, departure from Litzirüti
31:40 – Approaching and crossing Langwies Viadukt
32:50 – Stop at Langwies
34:55 – Gradient profile downhill from Langwies discussed
36:13 – Safety systems on the Ge 4/4 II RhB discussed
38:19 – ZSI-90 and ZSI-127 systems history discussed
40:40 – ZSI-90 functionality tutorial
45:24 – ZSI-90 installations and ADU display tutorial
57:35 – Gradient signaling tutorial
1:00:59 – Passing decent sign
1:02:09 – Passing level ground sign
1:02:40 – Stop on request sign implementation discussed
1:05:20 – Passing Peist, stop on request sign not lit
1:07:06 – Turning on stop on request signs at St. Peter Molinis station with external camera
1:08:05 – Stop at St. Peter Molinis with stop on request sign lit and ZSI-90 alarm announcing
1:10:05 – Stop on request button and lit signs showcased
1:11:23 – Departure from St. Peter Molinis
1:18:16 – Passing distant signal showing "Freie Fahrt" (green), not just the announcement
1:19:00 – Passing Lüen-Castiel and train from opposite direction
1:20:45 – Running downhill Untersax passing area
1:24:00 – Untersax passing area discussed
1:25:07 – (Carefully) passing Untersax

Broadcasted live on Twitch -- Watch live at   / tygerways  

Комментарии

Информация по комментариям в разработке