Q-1) What is minimum pipe size required for thermowell installation? and why ?
Q-2) What are design considerations for pipe rack ?
Q-3) What are steps involved in rack design ?
Q-4) What factors affect pipe span ?
Q-5) How do you decide which lines to be placed where in rack ?
Q-6) How much extra space required for rack ?
Q-7) What is double block and bleed? and where it used ?
Q-8) What is Bleed Valve ?
Q-9) What is relief valve ?
Q-10) What is safety valve ?
Q-11) How to close a gate valve ?
Q-12) In which position lever operated valve open and close ?
Q-13) How to calculate space between pipe to pipe ?
Q-14) How much clearance we kept from steel to pipe ?
Q-15) How to remove strainer from T type strainer ?
Q-16) what are the consideration we have take for temporary strainer or conical strainer ?
Q-17) How much clearance we kept from floor / grade to any drain valve ?

=============================================================
You can also support us by simply shopping on below links
AMAZON LINKS OF
INDIA https://amzn.to/3u5Eix9
USA https://amzn.to/2RzCQF6
Canada https://amzn.to/3aiUkw4
UK https://amzn.to/3giZ60s
Germany https://amzn.to/3mWZYZG
UAE https://amzn.to/2RxxZUT
Spain https://amzn.to/3tsy8XX

Комментарии

Информация по комментариям в разработке