Sound Transit Link 2 Line - South Bellevue to Redmond Technology, round trip, 2024

Описание к видео Sound Transit Link 2 Line - South Bellevue to Redmond Technology, round trip, 2024

The Sound Transit 2 Line will eventually connect Seattle with the Eastside. However, due to a technical issue the opening of I-90 floating bridge portion of the line has been delayed. Sound Transit decided to open a ‘starter’ line with only the Eastside stations, from the South Bellevue station to the Redmond Technology station. I attached my GoPro to left side windows in both directions to capture the ride.

Sound Transit Project Site: https://www.soundtransit.org/system-e...


0:00 Map
0:13 Depart South Bellevue Station
3:09 East Main Station
6:10 Bellevue Downtown Station
7:35 Wilburton Station
9:27 Spring District Station
11:20 BelRed Station
15:52 Overlake Village Station
17:44 Arrive Redmond Technology, end of the line
18:39 Depart Redmond Technology
19:38 Overlake Village Station
23:25 BelRed Station
25:30 Spring District Station
27:22 Wilburton Station
29:07 Bellevue Downtown Station
32:22 East Main Station
36:50 South Bellevue Station, end of the line

Filmed May, 2024

#transit

Комментарии

Информация по комментариям в разработке