It’s day 2 of the three day setup at Chester Cathedral and we’re making progress assembling a 64 foot long model railway of the West Coast Mainline.
• Pete talks how the layout is too small and how were going to remedy this.
• Overhead lighting is installed.
• Phil talks about the smooth setup.
• Dave shows off his “Core Railnuts” badge.
• Chris cleans the track.
• Test rolling stock is placed.
• Test trains run.
• Signs and departure boards are erected,
• Front skirts are fitted.
• Phil solders track.
• A time lapse of Tuesday’s work.
Come along and have a drive. Young and old welcome!