Installing a Montana Cottage's Sewer Line on Grade

Описание к видео Installing a Montana Cottage's Sewer Line on Grade

Installing a drain line, put on grade with the Roddie Inc. Pit Shot® Directional Drill.
This job was to install two new 4" sewer lines on grade. The first sewer line went 80 feet to the main home basement, going under the existing garage. This video documents the second sewer line on grade. The second sewer line is 40 feet long, going to the back cottage, to be connected in the crawl space.

Комментарии

Информация по комментариям в разработке