LIFTING JACKS

Описание к видео LIFTING JACKS

Tank Jacking Equipment, HLJ Series

Our Jacking System has been used for the erection of more than 2,000 tanks, up to 80 m in diameter and 1900 tons of lifting weight, on oil refineries, petrochemical plants, fertiliser plants, power generating stations, petroleum product installations & depots, and at liquid storage terminals at ports.

Tank Jacking Advantages:

Tank erection from top downwards shorter erection time, break the cost and improves the quality.

Work is done at ground level. Telescopic cranes are not longer required.

Safe for lifting and safe for job site workers. Accidents risk are reduced due to scaffolding is not longer needed.

Simple set up, operation and dismantle.

Flexible: Jacking equipment can split for erection of two smaller tanks or expanded for built larger tanks by means of adding extra jacks/trestles and/or power pack combined with the existing one.

Low maintenance required

Work is practically unaffected by rain, snow, hail, and wind because it can be carried out under the protection of the tank itself. Welding takes place mainly under cover

Jacking System can be used for construction of new tanks, dismantling of tanks, replacing tank base or foundation repair, and increasing tank capacity