1988 R100GS Bumblebee Walk Around

Описание к видео 1988 R100GS Bumblebee Walk Around

A closer look at what has been done on the '88 Bumblebee.

I forgot to mention a few things when I was running down the list of all the maintenance that was completed on the bike. Both carbs were ultrasonically cleaned and received new gaskets, o-rings and diaphragms. The driveshaft rubber packing was inspected and the driveshaft received new bolts upon reassembly. While the driveshaft was unhooked the transmission output flange turned smoothly and the clutch splines were lubed along with the splines on the driveshaft.

Комментарии

Информация по комментариям в разработке