Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Teaser: VR based Tactical Resource Planning on Spatial Data

  • VRVis GmbH
  • 2022-03-14
  • 80
Teaser: VR based Tactical Resource Planning on Spatial Data
VRvirtual realityxrextended realityspatial dataspatial data planningHMDsimulation-based trainingTactical Resource Planning on Spatial DataVRVisaustrian armybundesheerPlanning tactical operationsresearchvr-based mission planningvr-planned rescue missionvr strategy planning
  • ok logo

Скачать Teaser: VR based Tactical Resource Planning on Spatial Data бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Teaser: VR based Tactical Resource Planning on Spatial Data или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Teaser: VR based Tactical Resource Planning on Spatial Data бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Teaser: VR based Tactical Resource Planning on Spatial Data

Teaser for the Paper presentation video "VR based Tactical Resource Planning on Spatial Data" for IEEE VR 2022

Paper presentation for IEEEVR 2022 by Marina Lima Medeiros

Abstract: Planning tactical operations on topographic maps, for rescue or military missions, is a complex process conducted by interdisciplinary experts and involves the time-consuming derivation of 3D information from 2D maps, mostly solely executed by experienced professionals. Previous research repeatedly showed that virtual reality (VR) can convey spatial relationships and complex 3D structures intuitively. In this work, we leverage the benefits of immersive head-mounted displays (HMDs) and present the design, implementation, and evaluation of a collaborative VR application for tactical resource planning on spatial data. We derived system and design requirements from consultations with domain experts and observations of a military on-site staff exercise, a simulation-based training aiming to strengthen rapid decision-making and teamwork during a time of crisis. To evaluate our prototype, we conducted semi-structured interviews with domain experts who organized and observed field tests at different military staff exercises. The interviews support the proposed design of the prototype and show general design implications for planning tools in VR. Our results show that the potential of VR-based tactical resource planning is dependent on the technical features as well as on non-technical environmental aspects, such as user attitude, prior experience, and interoperability.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]