Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть 𝗧𝗘𝗠𝗣𝗢𝗥𝗔𝗥𝗬 𝗕𝗔𝗥𝗥𝗜𝗘𝗥𝗦: Crews Install Fencing on Santa Monica Pier Ahead of Bridge Replacement

  • Santa Monica Closeup
  • 2026-01-08
  • 1587
𝗧𝗘𝗠𝗣𝗢𝗥𝗔𝗥𝗬 𝗕𝗔𝗥𝗥𝗜𝗘𝗥𝗦: Crews Install Fencing on Santa Monica Pier Ahead of Bridge Replacement
Santa Monica PierPier Bridge Replacementpier bridge projectinfrastructure projectpublic worksShimmick ConstructionAce Fencingtemporary fencingconstruction updatecivil engineeringbridge replacementpier accesstemporary rampcoastal infrastructureurban infrastructureheavy equipmentconstruction sitehard hatsafety vestslow tvambient soundrelaxing ambiencesensory videosatisfying worksatisfying constructioncalming construction
  • ok logo

Скачать 𝗧𝗘𝗠𝗣𝗢𝗥𝗔𝗥𝗬 𝗕𝗔𝗥𝗥𝗜𝗘𝗥𝗦: Crews Install Fencing on Santa Monica Pier Ahead of Bridge Replacement бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно 𝗧𝗘𝗠𝗣𝗢𝗥𝗔𝗥𝗬 𝗕𝗔𝗥𝗥𝗜𝗘𝗥𝗦: Crews Install Fencing on Santa Monica Pier Ahead of Bridge Replacement или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку 𝗧𝗘𝗠𝗣𝗢𝗥𝗔𝗥𝗬 𝗕𝗔𝗥𝗥𝗜𝗘𝗥𝗦: Crews Install Fencing on Santa Monica Pier Ahead of Bridge Replacement бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео 𝗧𝗘𝗠𝗣𝗢𝗥𝗔𝗥𝗬 𝗕𝗔𝗥𝗥𝗜𝗘𝗥𝗦: Crews Install Fencing on Santa Monica Pier Ahead of Bridge Replacement

SANTA MONICA, CA — Thursday, January 8, 2026 — Crews from Ace Fencing were observed Thursday installing temporary fencing along the Santa Monica Pier as part of ongoing preparations for the Pier Bridge Replacement Project.

The fencing installation began Thursday and is intended to establish a protected construction zone while crews build a temporary vehicle ramp that will maintain operational access to the pier during bridge construction. The fencing is expected to remain in place for approximately five months while the temporary ramp is constructed.

Officials have stated that no pier closures are required for this phase of work and that access for businesses, visitors, deliveries, and emergency services will not be impacted.

The temporary ramp will allow construction vehicles and equipment to move between the pier deck and adjacent work zones while minimizing disruption to public circulation. The protected work area is intended to separate active construction operations from pedestrian and visitor areas for safety and logistical efficiency.

The Pier Bridge Replacement Project will replace the 86-year-old bridge connecting Ocean Avenue and Colorado Avenue to the Santa Monica Pier, a structure originally built in 1939. The new bridge is designed to meet modern seismic and safety standards, improve pedestrian flow, expand accessibility, and provide a projected service life of approximately 75 years. The project is being advanced in preparation for the 2028 Summer Olympic Games.

Construction is expected to continue through the end of 2027. Throughout the project, pier restaurants, shops, parking facilities, and public access are planned to remain open, with temporary pedestrian bridges and vehicle ramps used to maintain continuity of operations.

Shimmick Construction Company, Inc. is serving as the prime contractor on the approximately $35 million project. About 75 percent of the funding is provided through the Federal Highway Bridge Program, with the remainder coming from local transportation sources.

Santa Monica Closeup continues to document public infrastructure projects and civic improvements as they unfold.

#SantaMonicaPier #PierBridgeReplacement #Infrastructure #PublicWorks #Construction #SantaMonica

—
⚠️ 𝗖𝗢𝗣𝗬𝗥𝗜𝗚𝗛𝗧 𝗡𝗢𝗧𝗜𝗖𝗘
This video is protected by copyright and provided for personal viewing only. Any copying, downloading, re-uploading, reproduction, distribution, sampling, or other use, including commercial or editorial use, without prior written authorization from Santa Monica Closeup is strictly prohibited and may result in legal action.

© 𝟮𝟬𝟮𝟲 𝗙𝗮𝗯𝗶𝗮𝗻 𝗟𝗲𝘄𝗸𝗼𝘄𝗶𝗰𝘇 / 𝗦𝗮𝗻𝘁𝗮 𝗠𝗼𝗻𝗶𝗰𝗮 𝗖𝗹𝗼𝘀𝗲𝘂𝗽. 𝗔𝗹𝗹 𝗥𝗶𝗴𝗵𝘁𝘀 𝗥𝗲𝘀𝗲𝗿𝘃𝗲𝗱.
—
𝗔𝗕𝗢𝗨𝗧 𝗧𝗛𝗘 𝗖𝗥𝗘𝗔𝗧𝗢𝗥
Fabian Lewkowicz is an award-winning photojournalist based in Santa Monica and the creator of 𝗦𝗮𝗻𝘁𝗮 𝗠𝗼𝗻𝗶𝗰𝗮 𝗖𝗹𝗼𝘀𝗲𝘂𝗽. Known for his compelling imagery and neutral reporting, his work captures the pulse of the city—from civic affairs and emergency response to cultural moments and beach life. His photography has been showcased in galleries, museums, and public installations.
—
𝗦𝗨𝗣𝗣𝗢𝗥𝗧 𝗦𝗔𝗡𝗧𝗔 𝗠𝗢𝗡𝗜𝗖𝗔 𝗖𝗟𝗢𝗦𝗘𝗨𝗣
PayPal 👉 https://www.paypal.com/paypalme/fabia...
Venmo 👉 https://venmo.com/u/santamonicacloseup
—
𝗙𝗢𝗟𝗟𝗢𝗪 𝗨𝗦 𝗙𝗢𝗥 𝗗𝗔𝗜𝗟𝗬 𝗖𝗢𝗩𝗘𝗥𝗔𝗚𝗘
Instagram 👉   / santamonicacloseup  
Facebook 👉   / santamonicacloseup  
Twitter 👉   / smcloseup  
—
𝗕𝗘𝗖𝗢𝗠𝗘 𝗔 𝗖𝗛𝗔𝗡𝗡𝗘𝗟 𝗠𝗘𝗠𝗕𝗘𝗥 𝗙𝗢𝗥 𝗘𝗫𝗖𝗟𝗨𝗦𝗜𝗩𝗘 𝗣𝗘𝗥𝗞𝗦
   / @santamonicacloseup  
—
𝗟𝗜𝗖𝗘𝗡𝗦𝗜𝗡𝗚 & 𝗠𝗘𝗗𝗜𝗔 𝗜𝗡𝗤𝗨𝗜𝗥𝗜𝗘𝗦
Email 👉 [email protected]
—
𝗧𝗔𝗚𝗦: Photojournalism, Visual Journalism, Street Reporting, Documentary, Observational Photography, Press Photography, Independent Media, Southern California News, SMCU, SM©U
—

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]