AVOID these Costly Mistakes: WATCH This Before Construction!! 🤟🏻

Описание к видео AVOID these Costly Mistakes: WATCH This Before Construction!! 🤟🏻

Our Business:-
Order Sarees/Kurtis at Menmai Fabrics
  / menmai.fabrics  
   / @menmai.fabrics  
  / menmai.fabric  

WhatsApp Menmai at 7806869754 to order/enquire about Sarees & Kurtis (Text/Voice Message Only)

Timeline for easy navigation:-
Tops Covered:- 00:00 - 1:21
Engineer vs Mestiri:- 1:21
Payment:- 4:50
Mesonry Work:- 7:46
Electrical:- 10:28
Pluming Work:- 17:55
Painting:- 25:36
Tiles:- 27:33
Window:- 34:49
Gi Door:- 35:59

---------------------------------------------------------------------
Tiles rate : 45-100
Tile laying labour : 20/sqft
22/sqft with spacer
Granite: 240/running feet
Granite slab : 350 / slab

Eb : 180-220 / point
For me it is 250-300/point BCS of additional work

Plumbing varies based on requirements.

Cement used: Ramco
TMT: Tata Steel

UPVC: 400/Sqft for open type
320/sqft for sliding
UPVC Bathroom Door: 400/Sqft

Tata Pravesh GI Door
https://www.tatapravesh.com/product/d...

Metal roof - Tata Durashine Cool Shield 4mm XLPE Sheet Asian White Color
https://tatabluescopesteel.com/produc...

Heat Insulation Sheet before Tata Sheet - Aerolam 13mm single layer heat insulation XLPE sheet
https://aerolam.com/bubble-insulation/

Screw used - Corroshield Aluminium fastener

Square pipe - GP Pipe (long lasting without rusting) Just few rupees extra compared to regular MS square pipe