Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Safeguarding Schools through Civil Engineering (Churchie Bank Stabilisation)

  • Durack Civil
  • 2025-08-20
  • 37
Safeguarding Schools through Civil Engineering (Churchie Bank Stabilisation)
engineeringcivilcivil engineercivil infrastructuredurackdurack civilanglican church grammar schoolchurchie bank stabilisation worksbank stabilisation
  • ok logo

Скачать Safeguarding Schools through Civil Engineering (Churchie Bank Stabilisation) бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Safeguarding Schools through Civil Engineering (Churchie Bank Stabilisation) или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Safeguarding Schools through Civil Engineering (Churchie Bank Stabilisation) бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Safeguarding Schools through Civil Engineering (Churchie Bank Stabilisation)

Durack Civil : https://durackcivil.com.au/projects/c...
Durack Civil has been engaged by Anglican Church Grammar School to deliver urgent creek bank stabilisation works along Norman Creek, safeguarding school facilities and critical infrastructure from further subsidence. At Site 1, works involve excavation of a bank failure behind the school pool facilities and the installation of two rows of gabion baskets over a 50 m stretch, founded on a rock mattress with a combigrid base. These works are scheduled around tidal movements of the Brisbane River to allow safe and effective construction. During the school holiday period, Sites 2 and 3 will be addressed with the installation of 200 timber piles driven to a depth of 5 m. Designed by Bligh Tanner, the timber piles will be placed within existing mangrove roots without causing damage, working in tandem with the vegetation to anchor the bank and mitigate tidal impacts.

#churchie #civilengineering #civil #engineering

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]