Overhauling The Vande Bharat Express | India's First Vande Bharat 2.0 SS1 Periodic Overhaul

Описание к видео Overhauling The Vande Bharat Express | India's First Vande Bharat 2.0 SS1 Periodic Overhaul

This video will take you behind the scenes to witness the complete overhauling process of the Vande Bharat 2.0 rake at the Carriage Repair Workshop, Matunga. From disassembly to inspection, repairs, and reassembly, this detailed video provides a comprehensive look at the meticulous care and maintenance that ensures the Vande Bharat Express remains at peak performance.

Watch as the highly skilled team of engineers and technicians works through every stage of the overhaul, including:

Inspection of critical components like bogies, traction motors, and braking systems
Replacement of worn-out parts and thorough cleaning of key assemblies
Electrical and mechanical testing for safety and efficiency
Final reassembly and quality checks to ensure the train is ready for service
This video showcases the precision, expertise, and technology that goes into maintaining one of India’s most advanced trains, keeping it reliable and efficient for thousands of passengers daily.

If you're fascinated by railway engineering or curious about the upkeep of India's cutting-edge trains, this video is a must-watch!

Don't forget to like, share, and subscribe for more behind-the-scenes insights into railway operations!

Chapters -
0:00 – Disclaimer and Intro Slides
0:11 – Defining Vande Bharat
1:10 – Understanding Periodic Overhaul
2:32 – Intro Drop
2:51 – Inward of the Rake
4:04 – Coach Uncoupling
5:41 – Shunting
5:57 – Nose Cone Removal
6:55 – Lifting
7:24 – Bogie Removal
8:23 – Bogies in the trolley shop
11:18 – Wheels Turning in Wheel Shop
14:37 – Air Springs and Damper
17:31 – Bogie Frame Painting
18:39 – Bogie Assembly
21:47 – Bogie and Coach mating
22:24 – Coach Furnishing
24:13 – Undergear maintenance
24:37 – Women Empowerment
26:18 – Overhead Maintenance
28:15 – Nose Cone repair
30:05 – Window Replacement and Door Service
31:37 – Coach Electricals
32:56 – Head code Glass Replacement
33:55 – Coach Coupling
35:10 – Final works
36:08 – CWM’s View
37:58 – Dispatch
39:23 – Overview
40:19 – Behind The Scenes – Team Simule Motions


#VandeBharatExpress #OverhaulProcess #IndianRailways #TrainMaintenance #MatungaWorkshop #RailwayEngineering #VandeBharat2.0

Комментарии

Информация по комментариям в разработке