Construction Progress | Built Armstrong | Outside renovation of grounds

Описание к видео Construction Progress | Built Armstrong | Outside renovation of grounds

The construction progress of our 2 story home resumes with the privacy fence and entrance into the property. The footer and stem walls as chb fence is now completed and we will be starting to landscaping and design of the 6 m wide driveway up and into the property. After only 3 days the crew was able to complete this task due to proper training and well use of the equipment. The quality is absolutely some of the best in the area and nothing matches it. We will continue with the outdoor landscaping and start to add in features for planting beds on either side of driveway and the grey water system installation.
Once the outdoor area is contained, cleaned and completed all will move inside and some outside on finish of exterior and interior! There's so much training still left to be done. The biggest obstacles coming up is the training of proper tile installation techniques and how to properly cut 45s. By the end of next week we look to have exterior of house painted and pvc panels installed!!!


DETAILS OF THE PROPERTY 🏡
Location - pudoc Norte, San Vicente Locos Sur!
- 7 HOURS drive from manila
- 13 MINUTES away from vigan city
- 1.5 hour away from Loaog airport
- Less 15 minutes from hospital, immigration, schools, Malls

- the subdivision will have developments!
included cemented right of way with dranaige!
-Good neighbours, most of them are international from expat other countries!

(The house)

- 500 SQM TOTAL LOT AREA
- 165 SQM HOUSE ARE
- 25 SQM SWIMMING POOL
- 60 SQM POOL HOUSE
- 5 TOTAL BED
- 3.5 TOTAL 🚽
- LARGE PARKING AREA
- SECURED UTILITY ROOM
- DECENT LAUNDRY AREA
- BBQ AREA



PRICE 8.5M
WHAT'S INCLUDED?
-HOUSE WILL BE FINISHED!
-IT WILL HAVE SOLAR SYSTEM
- WE WILL INCLUDE STOVE
- CABINETS IN KITCHEN
- AIRCON EACH ROOM
- Ceiling FANS EACH ROOMs
- 3 Ceiling FANS WILL BE PLACED IN 1ST FLOOR FOR KITCHEN and LIVING ROOM

- POLISHED CONCRETE IN THE FIRST FLOOR!
-WILL BE TILED IN THE SECOND FLOOR
- Modern GLASS railing stairs
- Modern Glass railing for the back and front balcony.

-30 % down payment for reservation
-the rest of 70 % after the completion of the house 😊



CONTACT NUMBER 09395265253
-Viber
-WhatsApp
-Smart

- Email address

[email protected]




Asking price is now reduced by 1.5 million pesos to 8.5 million with 30 percent dp to reserve










📍Follow us on Facebook!💻
➡️   / thearmstrongfa2  
===================================


📧Send us an inquiry or questions 📧
[email protected]
===================================
Like our Music? Try it here!ì

🎶🎶Music license Epidemic Sound🎶🎶🎶🎶🎶
Try now for 30 days

https://www.epidemicsound.com/referra...
========


Attention- All drone video provided is under creative commons license not for profit. All drone video was obtained from a non-monetized platform under creative commons.

- All locations filmed were under permission and strict access was given. at no point in time was any film taken without permission.

Filmed on Samsung note10+
Edited on KineMaster Pro Version

#landscaping
#ilocos
#philippines

Комментарии

Информация по комментариям в разработке