INSTALL a LOWRANCE Elite 9 Ti2 | DORA PROJECT 🧜‍♀️

Описание к видео INSTALL a LOWRANCE Elite 9 Ti2 | DORA PROJECT 🧜‍♀️

👇🏼🧾🕐Timestamps for all the installation steps are listed below 🕐🧾👇🏼

In this video, we improve DORA's looks and functionality by upgrading the sounder system with two LOWRANCE Elite 9 Ti2s.

Timestamps:
0:00 - Introduction
1:00 - Unboxing
3:57 - Disconnecting Battery
5:07 - Removing Old Sounder
7:30 - Placement of a New Sounder
9:58 - Planning wiring Sequence
11:52 - Drilling holes for cable routing
13:40 - Routing Transducer Cable
15:20 - Mounting Brackets to Transducer
17:48 - Mounting transducer to Hull
17:56 - Connecting Blade fuse to power cable
22:03 - Re-wiring the blade fuse so we can fit everything through the routing holes
22:52 - Connecting power cables to BUS Bar / Switch Panel
24:25 - Initialising power to the cables
25:30 - Quick tips for plugging cables into the MFD
26:47 - Powering up for the first time!


Stay up-to-date with all the changes, big and small. Like us on Facebook, Subscribe on YouTube and Follow us on Instagram.

Stay tuned for more, Grifters!

👍Facebook: facebook.com/Grift.Co
📷 Instagram: instagram.com/grift.co
🎥Youtube:    / griftco  

💌Subscribe to our Youtube Channel: https://goo.gl/pzQNVV

Комментарии

Информация по комментариям в разработке