OFW SIMPLE HOUSE | Katas ng OFW, Building The House Cost 1,190,633 PHP|$23,812 USD with Labor

Описание к видео OFW SIMPLE HOUSE | Katas ng OFW, Building The House Cost 1,190,633 PHP|$23,812 USD with Labor

HELLO PO SA LAHAT.. WELCOME BACK TO MY CHANNEL RANDY YERRO OFW SIMPLE HOUSE VLOG..

This House🏠🏠🏠 Video Own by Sir

From Nueva Ecija. PHILIPPINES

CONGRATS SIR GOD BLESS.🙏🙏🙏

Start Building a House January 18 2019

BUILDING THE HOUSE COST with Labor
1,190,633 PHP $23,812 USD

LOT. 430sqm 330,000 php

House Size 15x10 meter 150sqm
3 bed rooms
2toilet and bath
1laundry room
Living
Dining
Kitchen
Garage

Qty Item Price/Unit Total

90pcs 12mm 188 = 16,920
700pcs 10mm 130 = 91,000
350 sacks Holcim Cement 230 =80,500
80pcs Coco lumber 2x2x12 100 = 8,000
50pcs Coco Lumber 2x4x12 200 = 10,000
45 load Buhangin 1,400 = 63,000
25 load Buhangin Mixed 1,300 = 32,000
10pcs Plywood Marine1/2 650 = 6,500
40 kilo Pako 60 = 2,400
92 kilo Alambre #16 60 = 5,520
900pcs Hollow Block D5 12 = 10,800
4,100pcs Hollow Block D4 10 = 41,000

Electricity Materials and Plumbing
QTY ITEM PRICE/UNIT TOTAL

8pcs Orange Pipe #4 300 = 2,400
12pcs Orange Pipe #2 150 = 1,800
8pcs Orange Elbow #4 75 = 600
2 pcs Orange T connection 4x2 85 = 170
1pcs Orange Y connection 4x4 85 = 85
12pcs orange Elbow#2 25 = 300
2pcs Clean Out #4 85 = 170
12 pcs Blue Pvc Pipe 1/2 60 = 720
10pcs Tapelon 15 = 150
2 Liter Solvent Cement 380 = 760
17pcs G.I Elbow 1/2 30 = 510
10pcs G.I connector 1/2 30 = 300

MATERIALS COST TOTAL 375,605
LABOR COST TOTAL 150,242
STRUCTURAL WITH BACKFILLING 525,847 php

STEEL TRUSSES MATERIALS
Qty Item Price/Unit Total

44pcs Angle Bar 1/4×2 Green 680 = 29,920
40pcs Angle Bar 1/4×1 1/2 Green 520 = 20,800
115pcs Angle Bar 3/16×2 Yellow 580 = 66,700
17pcs C Purlins 2/7×1.5 930 = 15,810
40kilo Welding Rod special 135 = 5,400
12 Gallon Epoxy Primer Gray 650 = 6,720
4 Gallon Lacquar Thinner 200 = 800
6pcs Paint Brush 15 = 90
8pcs Baby Roller 50 = 400
4pcs Paint Tray 35 = 140
7pcs Toka Cutting disk #14 200 = 1,400

Materials Total Cost148,180
Labor Total Cost 59,272
STEEL TRUSS WITH LABOR 207,452 PHP

TilesPan Color Gray and Spandrel
with Installation cost 178,114 php

Qty Item Price/ Unit Total

13pcs Annaloc Windows 45,000
Panel Door 5pcs 4,000 = 20,000
Hamba 5pcs 1,800 = 9,000
Cr Door 3pcs 3,000 = 9,000
Cr Bowl 2pcs 3,500 = 7,000
Door Knob Lock 5pcs 650 = 3,250
Dealt Bolt Lock 2pcs 550 = 1,000
Palitada Finewall/Windows 21,000
Total Cost 115,350
Labor Cost 18,870

Finishing,Palitada....
Materials Cost = 75,000 Pesos
Labor Cost = 70,000 Pesos
TOTAL COST = 145,000 Pesos

BUILDING THE HOUSE COST with Labor
1,190,633 PHP $23,812 USD

HOUSE AND LOT COST
1,520,633 PHP $30,412 USD


HOUSE IS LOCATED IN NUEVA ECIJA PHILIPPINES

Dont Forget to Like and Subcribes😊

Thank You for Watching and Have a Good Day💗

My Friend Channel😊
https://www.youtube.com/channel/UCnTQ...

#ofwhousesinthephilippines #buildingahousestepbystep

💝💝💝🏠🏠🏠💝💝💝

OFW SIMPLE HOUSE VLOG
   • Katas ng OFW, OFW SIMPLE HOUSE STORY ...  
   • OFW SIMPLE HOUSE Floor Plan with kunt...  
   • OFW SIMPLE HOUSE Steel Trusses Step b...  
   • OFW SIMPLE HOUSE COLOR ROOF 73,000 wi...  
   • OFW SIMPLE HOUSE GUIDELINES SA PAG PP...  
   • OFW SIMPLE HOUSE TIPS KUNG SAAN GAGAM...  
   • BAYANIHAN SA PAG GAWA NG SMALL CAR PORCH  
   • OFW SIMPLE HOUSE  PAGPAPAGAWA NG SPAN...  
   • OFW SIMPLE HOUSE COLOR ROOF  EURO ROYAL  
   • Katas ng OFW, OFW SIMPLE HOUSE STORY ...  

BEBS YERRO HOUSE VLOG

A BEAUTIFULL HOUSE

   • Bungalow house design Part1  
   • Bungalow house design Part2  
   • Bungalow house design Part3  
   • Bungalow house design Part4  
   • Bungalow house design Part5  
   • Bungalow house design Part6  
   • Bungalow house design Part7  

Комментарии

Информация по комментариям в разработке