Standard Y-Tool Assembly Overview

Описание к видео Standard Y-Tool Assembly Overview

The UMS Flowell Y-Tool Sub Assembly comprises of the following items:

• 6ft handling sub with a top connection to suit the customer’s production
tubing
• Optional top nipple used to set a plug to test the production tubing or set
a packer, and used with an isolation tool to straddle the y-tool body for
bullheading the well or isolating the upper ESP when running dual y-tool
ESP completions
• Y-tool used to create a junction between the bypass and the ESP discharge
• Bypass nipple used for setting a blanking plug, wireline plug, coil tubing
plug, and a lower profile for the isolation tool used in combination with the
top nipple
• Adjustable swivel with 15-inch stroke adjustment for make up to the
bypass tubing
• 10ft pump sub for make up to the ESP pump discharge head
• Blanking plug set in the bypass nipple to prevent recirculation through the
bypass tubing when running the ESP
• Optional bypass tubing crossover for reducing bypass tubing size.

For more information visit our website: https://umsflowell.com/y-tool-sub-ass...

Contact: [email protected]

Комментарии

Информация по комментариям в разработке