Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Major Breakthrough Achieved at Zojila Tunnel Vertical Shaft 1 | Megha Engineering

  • Megha Engineering and Infrastructures Ltd
  • 2025-07-28
  • 17075
Major Breakthrough Achieved at Zojila Tunnel Vertical Shaft 1 | Megha Engineering
Zojila Tunnel BreakthroughZojila Tunnel UpdateZojila Tunnel ConstructionZojila Pass TunnelVertical Shaft BreakthroughLadakh Zojila TunnelJammu Kashmir Tunnel ProjectZojila Tunnel Newsmeilmegha engineeringmeil videosmeil official channelmeil power projectsmeil irrigation projectsmeil hydrocarbons projectsmeil transport projectsmeil road projectsmeil infrastructuremeil projects in indiameil international projectsindia tunnels
  • ok logo

Скачать Major Breakthrough Achieved at Zojila Tunnel Vertical Shaft 1 | Megha Engineering бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Major Breakthrough Achieved at Zojila Tunnel Vertical Shaft 1 | Megha Engineering или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Major Breakthrough Achieved at Zojila Tunnel Vertical Shaft 1 | Megha Engineering бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Major Breakthrough Achieved at Zojila Tunnel Vertical Shaft 1 | Megha Engineering

#meilgroup #zojilatunnel #breakthrough #jammuandkashmir #meghaengineering

A significant breakthrough has been achieved in Ventilation Shaft 1(Vertical Shaft) of the Zojila Tunnel, where a 2.8-meter diameter pilot tunnel has been successfully excavated out of the total planned shaft diameter of 7.5 meters. This crucial phase was completed using the precise Raise Climbing method, marking an important milestone in the construction of this deep vertical shaft. The pilot tunnel acts as a guide for the subsequent enlargement process, ensuring the full 7.5-meter diameter shaft is developed safely and efficiently in the challenging Himalayan terrain.


Megha Engineering & Infrastructures Limited (MEIL) is a major infrastructure company headquartered in Hyderabad, India. The company was established in 1989 as a small fabrication unit. In due course of time, the unit made a name for itself. We are fired by the zeal to equip the country with an engineering and infrastructure foundation that can hold up its pillars for generations to come.

Visit @ https://meil.in/

Follow Us..
Twitter: https://x.com/MEIL_Group
Instagram:   / reels  
FaceBook:   / meilteam.in  
Linkedin:   / meilofficial  
YouTube:    / @meilgroupofficial  

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]