Learn how to fabricate and install a steel tank cleanout door step-by-step. In this practical guide we cover layout and marking, cutting the shell opening, reinforcement/backing plates, fit-up, welding sequence, NDT, and leak testing—following best practices from API 650 (design/fabrication) and API 653 (repair/alteration/inspection) for above-ground storage tanks. Perfect for fabricators, site engineers, and inspectors working on crude oil, water, and fire-water tanks.
What you’ll learn
Cleanout door vs. manway: terminology, sizes, and typical locations near the annular plate
Job safety: permits, hot-work controls, gas testing, confined space, PPE
Layout & cut: centerlines, edge distances, reinforcement calculations (overview), cold-cut vs. oxy-fuel
Reinforcement/backing: backer ring or insert plate, fit-up gaps, tack-weld strategy, distortion control
Welding: root pass and fill passes (SMAW/GTAW/GMAW), preheat/interpass, sequence to minimize warping
NDT/Inspection: VT, MT/PT where applicable, dimensional checks, edge blending, final cleaning
Hardware & sealing: gasket surfaces, hinge/bolt arrangement, latch, sealant, final torque pattern
Tightness tests (as required by project specs) and documentation/turnover
Why this matters
A properly fabricated clean-out door (shell manway) allows safe entry, sludge removal, and inspection with minimal downtime. Following API 650/653 practices improves reliability, reduces leaks, and extends tank service life.
Tools & materials (typical)
Measuring & marking tools, cutting tools (cold saw/Plasma/Oxy-fuel as allowed), clamps, strong-backs, welding machine, consumables, grinders, surface prep tools, NDT kit (MT/PT as specified), gaskets/bolts/hinges, sealant, and paint system per spec.
Notes & disclaimers
This video is for educational purposes. Always follow your site procedures, WPS/PQR, ITP, and local regulations. Refer to your project drawings and the latest editions of API 650 and API 653 for mandatory requirements.
If this helped you, like & subscribe for more fabrication, piping, and storage-tank content. Got questions about dimensions, WPS, or inspection? Drop a comment and we’ll help!
Search keywords inside the description (SEO):
steel tank cleanout door, clean-out manway, shell opening, tank manhole, API 650, API 653, storage tank repair, welding sequence, reinforcement pad, backer ring, nozzle insert, NDT, MT/PT/UT, hydrotest, leak test, crude oil tank, above-ground storage tank
#API650
#API653
#storagetank
#welding
#fabrication
#manway
#cleanout
#NDT
#inspection
#oilandgas
Информация по комментариям в разработке