Installing a soil stack and waste pipe system with worksheet at the end

Описание к видео Installing a soil stack and waste pipe system with worksheet at the end

Normally done towards the end of the second year.

Please note - the Top pipe on the boss (32mm pipe) Should be middle to middle 550mm.

Air test will be in another video.

Комментарии

Информация по комментариям в разработке