Malswick. June / July 2023. Extending The Cut. More Canal In Water.

Описание к видео Malswick. June / July 2023. Extending The Cut. More Canal In Water.

In May 2023 H&GCT got part of the canal cut at Malswick in water.
See    • Malswick.  May 2023.   Getting Part O...   for details.

This video covers the second phase. Digging a further section of the new cut to full depth and width, and using the extracted material to raise the embankment over the low-lying ground to link up with the section of canal currently in water.

For more information on The Herefordshire and Gloucestershire Canal Trust visit our website.
https://www.h-g-canal.org.uk/


Erratum.

The caption at 06:20 is in the wrong place. It refers to the loose clay in the bottom of the cut at the low point of the small culvert, visible at 07:30, 12:03 and other places within the video.

Комментарии

Информация по комментариям в разработке