CPE #6

Описание к видео CPE #6

This evolution uses one Engine Company and four members, an aerial apparatus with four members, an elevated master stream appliance and supply line. This timed evolution begins when the aerial apparatus stops at the designated fire area, airbrake applied. The Engine joins the evolution immediately.

Standard requirements:

 The aerial apparatus stops at the designated fire area and prepares the elevated master stream for service.
 The Engine Company deploys a reverse lay using a minimum of 100’ of 4” supply line from the aerial to the hydrant
 Once the water supply is secure, the Engine Company relay pumps to the aerial apparatus
 Time stops when the master stream is supplied with effective water flow and pressure

Recommended maximum time for this evolution is 4 minutes.

Music By:
SoundUniverseStudio from Pixabay
and
Oleksii Kaplunskyi from Pixabay

Комментарии

Информация по комментариям в разработке