Atal Setu in Monsoon 2024 | Mumbai Trans Harbour Link MTHL | Meets MSRTC E Shivneri Olectra Bus

Описание к видео Atal Setu in Monsoon 2024 | Mumbai Trans Harbour Link MTHL | Meets MSRTC E Shivneri Olectra Bus

The Mumbai Trans Harbour Link, officially named as Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu and colloquially known as Atal Setu, is a 21.8 km (13.5 mi) 6-lane grade separated expressway bridge, which connects Mumbai with Navi Mumbai, its satellite city. It is the longest sea bridge in India, and the world's 12th longest sea bridge. The bridge begins in Sewri, South Mumbai, crosses Thane Creek north of Elephanta Island, and terminates at Chirle near Nhava Sheva in Uran taluka, Navi Mumbai. The road is linked to the Mumbai–Pune Expressway in the east and to the Coastal Road in the west. The 6-lane highway is 27 meters in width, in addition to two emergency exit lanes, two edge strips, parallel crash barriers and noise barriers on both sides. The project costs a total of ₹17,843 crore (US$2.1 billion). The bridge has a capacity to handle 70,000 vehicles per day. Construction on the bridge began in April 2018 and was inaugurated by Prime Minister Narendra Modi on 12 January 2024.

In the 1990s, keeping the future of the Mumbai Metropolitan Region in mind, the Mumbai Metropolitan Region Development Authority (MMRDA) began studies on how to decongest the rising traffic and congestion in Mumbai, and accidents and mishaps as their direct consequences. There are currently six bridges connecting Mumbai and Navi Mumbai across the Thane Creek, but, they are too narrow and outdated to handle future traffic. As a result, all of them are constrained and are carrying traffic beyond their limits, also increasing the commute time between the two cities. So, the MMRDA planned to build a comprehensive link between the two cities so to handle more traffic and make travel more easier, faster, safer and hassle-free. The proposal was sent to the Government of Maharashtra for consideration in 2012. In 2015, the project was approved by the Government of India and the Ministry of Road Transport and Highways (MoRTH). Hence, the foundation stone for the construction of the project was laid by Prime Minister Narendra Modi on 24 December 2016. Initially, it was expected to be completed by 2021. Then, the MMRDA awarded contracts for the project in November 2017, and construction began in April 2018, which was scheduled to be completed within 4.5 years, by 2022. However, the construction was delayed by around 8 months due to the COVID-19 pandemic, and was expected to be completed by August 2023, then again by December 2023. The construction was finally completed in December 2023, and was inaugurated by Prime Minister Narendra Modi on 12 January 2024.

Keep Watching !!
Subscribe me for more videos !!

Video by,
Prathamesh Yeram

#atalsetubridge #atalsetu #mthl #narendramodi #india #mumbaitransharbourlink #mumbai #navimumbai #atalsetumonsoon #monsoon #monsoon2024 #heavyrain #kia #kiaseltos #kiaindia #shivneribus #shivneri #msrtc #stmahamandal #highway #highways #indianhighways #indianroads #bridges #longestbridge #seabridge #indianbridge #msrdc #maharashtra #eknathshinde #devendrafadnavis

Комментарии

Информация по комментариям в разработке