Devonshire Square, London - Construction Time-Lapse

Описание к видео Devonshire Square, London - Construction Time-Lapse

The "Cut and Carve" of a high rise building in London - 7 Devonshire Square.

The contractors, "BUILT", demolished the top two floors and then rebuilt them with an extra one on top.

The video was shot over a period of 19 months.

Комментарии

Информация по комментариям в разработке