Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Mistake that can be Avoid at Panchayat level Construction Work

  • civilplusIT Techno
  • 2025-04-04
  • 41
Mistake that can be Avoid at Panchayat level Construction Work
avoid house construction mistakesavoid 10 house construction mistakeshouse construction big mistakechhat construction10 house construction mistakes by contractorsave 5 lakh on house constructionconstruction workhouse construction costconstructionbuilding construction costshow to reduce house construction costlow budget house constructionram janki constructionconstruction surveyinghouse constructionhouse construction tips
  • ok logo

Скачать Mistake that can be Avoid at Panchayat level Construction Work бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Mistake that can be Avoid at Panchayat level Construction Work или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Mistake that can be Avoid at Panchayat level Construction Work бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Mistake that can be Avoid at Panchayat level Construction Work

Hello and welcome to my channel Today's Video is on
Mistake that can be Avoid at Panchayat level Construction Work
*Common Mistakes in Panchayat-Level Construction Work and How to Avoid Them*

1. *Inadequate Planning and Feasibility Studies*
**Mistake**: Starting projects without assessing needs, resource availability, or site conditions (e.g., soil stability, drainage).
**Impact**: Delays, cost overruns, or unusable infrastructure (e.g., roads washed away due to poor drainage).
**Solution**: Conduct thorough feasibility studies, involve engineers for technical input, and create detailed project timelines.

2. *Lack of Technical Expertise*
**Mistake**: Designing projects without consulting engineers or architects.
**Impact**: Structural weaknesses (e.g., collapsing community halls).
**Solution**: Partner with government technical agencies (e.g., State Rural Development Departments) for design and supervision.

3. *Corruption in Procurement*
**Mistake**: Awarding contracts to unqualified contractors through nepotism or bribery.
**Impact**: Substandard work and wasted funds.
**Solution**: Implement transparent e-tendering processes and involve third-party auditors.

4. *Poor Quality Control*
**Mistake**: Using substandard materials (e.g., low-grade cement) or unskilled labor.
**Impact**: Premature deterioration (e.g., cracked school buildings).
**Solution**: Mandate material testing and hire qualified supervisors for on-site checks.

5. *Financial Mismanagement*
**Mistake**: Misallocating funds or lacking budget tracking.
**Impact**: Incomplete projects due to fund shortages.
**Solution**: Use digital tools for real-time expenditure tracking and conduct regular audits.

6. *Ignoring Community Needs*
**Mistake**: Not consulting locals about priorities (e.g., building a clinic instead of a needed school).
**Impact**: Low community utilization or disputes.
**Solution**: Hold public hearings and form monitoring committees with residents.

7. *Environmental Negligence*
**Mistake**: Ignoring ecological impacts (e.g., deforestation, waterlogging).
**Impact**: Long-term environmental harm.
**Solution**: Conduct environmental impact assessments and adopt eco-friendly techniques (e.g., rainwater harvesting).

8. *Inadequate Supervision*
**Mistake**: Failing to monitor progress or compliance.
**Impact**: Deviations from plans (e.g., narrower roads than designed).
**Solution**: Assign dedicated project managers and use progress-tracking apps.

9. *Poor Documentation*
**Mistake**: Incomplete records of approvals, expenditures, or inspections.
**Impact**: Legal disputes and accountability gaps.
**Solution**: Maintain digital archives and use standardized reporting formats.

10. *No Maintenance Plan*
**Mistake**: Neglecting post-construction upkeep.
**Impact**: Rapid infrastructure decay (e.g., non-functional water pumps).
**Solution**: Allocate maintenance funds and train locals in basic upkeep.

**Additional Considerations**:
**Legal Compliance**: Adhere to building codes and labor laws to avoid penalties.
**Risk Mitigation**: Assess risks (e.g., flooding) and incorporate contingency plans.
**Skill Development**: Train Panchayat members in project management and governance.

By addressing these issues through structured planning, transparency, and community engagement, Panchayats can enhance the quality, sustainability, and acceptance of rural infrastructure projects.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]