Rotary Evaporator Installation

Описание к видео Rotary Evaporator Installation

#rotaryevaporator #evaporator

Follow this detailed step-by-step video of Rotavapor® R-100 and Vacuum Pump V-100 installation. For written guidance, check the Operation manual for R-100 https://bit.ly/3Gs3aFb and V-100 https://bit.ly/3rdRKAk

Rotavapor® technology and history https://bit.ly/3HiGE2x
Rotavapor® R-300 https://bit.ly/3s2qNyI

Time Stamps:
00:00 Unpacking and content review
00:51 Mounting the rotary drive unit
01:57 Fixation of the vapor duct
02:43 Fitting the condenser
03:42 Fitting the evaporating flask, glass stopcock, receiving flask
04:47 Connecting the cooling media tubing
06:43 Filling of the heating bath
07:09 Operating the Rotavapor®
08:25 Feeding solvent during distillation
09:03 Installing the Vacuum pump V-100: electrical connections and connecting the silencer
10:34 Fitting and connecting the Interface I-100
12:49 Connecting a Woulff bottle
15:34 Connecting the Interface I-100 via the Woulff bottle
16:51 Connecting the vacuum pump to the condenser and electrical connections
18:20 Performing a leak test

DIY Installation support:
If you like support during the installation, book our DIY Installation package https://www.buchi.com/en/support/contact and get assisted by a BUCHI service engineer.

FOLLOW US ON SOCIAL MEDIA
Facebook   / buchilabequipment  
Instagram   / buchi_labortechnik_ag  
Linkedin   / b%c3%bcchi-labortechnik-ag  

GET A QUOTE OR ASK A QUESTION
https://bit.ly/3laNPRT

Комментарии

Информация по комментариям в разработке