How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level || By CivilGuruji

Описание к видео How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level || By CivilGuruji

#civilGuruji #civilengineerstraininginstitute #practicalknowledge #works #Civil #Engineer #Civil #Engineers #Form #Work #Level #Check
How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level

Start Your TRAINING NOW
Enroll and get started :- https://civilguruji.com/s/store/cours...

For More Details Call Now : 9111001234

How to Read Measurement Tape :-    • BASIC KNOWLEDGE FOR CIVIL ENGINEERING...  

About This Video ------------------------------------------------------------------------------------
In this video Er. Chetan Sharma, Corporate Trainer of Civil Guruji explaining about How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level

First check formwork before you allow placing of reinforcement. This is necessary as certain formwork defects can’t be corrected or are difficult to correct after reinforcement is placed in position.
Checking reinforcement.
First check the quality of shuttering plates. Avoid using plates with uneven surface and damaged edges. They must be of regular size.
If plywood is used, it should be of BWP grade and durable under alternate wetting and drying conditions.
Take approval for shuttering from Engineer-in-charge or supervisor before tying reinforcement. How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level
Engineer-in-charge or supervisor must check the slope, level of slabs and beams before placing reinforcement in position. Preliminary inspection should be done even before commencing tying of reinforcement.
huttering should be hard enough to withstand the load of concrete and impact of placing of concrete and vibrations. How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level
Oil or mould release agent should be applied on shuttering plates so that shuttering can be easily removed after concrete gets initial strength.
12 mm diameter PVC pipe nipples should be provided before casting of sloping roof. These nipples will be useful for cement grout after slab is concreted. The grouting is needed as however great precautions you may take while concreting sloping roof, the slab is liable to leakage. The grouting will reduce the leakage.
Mark one level on every column as per beam depth.
Position and level of beam bottom supports should be with respect to the depth of the beam.
How to Check Level of Shuttering and Slab Casting | Slab And Beam Shuttering Level