Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Spotlight On Service | Yeovil District Hospital

  • Weatherproofing Advisors Limited
  • 2023-10-05
  • 65
Spotlight On Service | Yeovil District Hospital
  • ok logo

Скачать Spotlight On Service | Yeovil District Hospital бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Spotlight On Service | Yeovil District Hospital или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Spotlight On Service | Yeovil District Hospital бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Spotlight On Service | Yeovil District Hospital

Yeovil District Hospital NHS Trust, in collaboration with LED Architects, embarked on a pivotal roof refurbishment journey at their primary healthcare facility. Entrusting the expertise of Weatherproofing Advisors (WPA), the project aimed to replace the existing built-up felt, warm roof construction that had surpassed its functional lifespan. The primary objectives were to establish a watertight roof system, ensuring zero water ingress, and to lay the foundation for future modular unit installations. The refurbishment featured a torch-applied bituminous felt system, innovative sumped gutter details, “Bigfoot” style roof mounts for air handling units, and a specialized solution for an existing modular building. A highlight of the project was the introduction of a vibrant red walkway, ensuring clear and safe access to roof-mounted equipment. This comprehensive approach resulted in a state-of-the-art roofing solution that seamlessly blends safety, durability, and aesthetics, setting a benchmark for future infrastructural endeavors.

Working with Yeovil District Hospital NHS Trust and their appointed partner, LED Architects, WPA was commissioned to survey the roof and provide a detailed report of its condition and to consider the appropriate solutions. Following the survey, it was determined that the existing roof is a built-up felt, warm roof construction covering a screed laid to falls. The felt was suffering from large blisters from water ingress throughout the roof, causing laps to fail and more water to penetrate the system. The roof was considered to have reached the end of its serviceable life and WPA provided a solution that removed the defects from the old roof and provided a new built-up felt system that met the client’s key objectives.

The key objectives for the client were to ensure a watertight roof covering with no water ingress and to provide a surface suitable for the future installation of modular units.

WPA removed the blistered and defective areas of the roof and installed a torch-applied bituminous felt system with two sumped gutter details running the length of the roof. Existing air handling units were temporarily raised to receive the new felt covering and replaced on to new “Bigfoot” style roof mounts. There were multiple roof lights & and penetrations on the roof which were carefully detailed to ensure the integrity of the system. There is an existing modular building that has been built on top of the Level 3 roof area that requires a different solution owing to the material that the modular building is constructed from. Using a torch-applied solution here was not deemed appropriate, a liquid coating solution was installed here after consultation with the supplier to ensure that the 20-year warranty is maintained. To ensure a clear, demarcated access route to all roof mounted plant, a red walkway has been incorporated on to the field area and has replaced the use of paving slabs and thus reducing the weight loading on the structure.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]