Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть [One More Shutdown Next Year][SMRT] R151 (903/904) from Tanah Merah to Expo

  • Singapore Trains Channel
  • 2025-12-07
  • 2527
[One More Shutdown Next Year][SMRT] R151 (903/904) from Tanah Merah to Expo
  • ok logo

Скачать [One More Shutdown Next Year][SMRT] R151 (903/904) from Tanah Merah to Expo бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно [One More Shutdown Next Year][SMRT] R151 (903/904) from Tanah Merah to Expo или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку [One More Shutdown Next Year][SMRT] R151 (903/904) from Tanah Merah to Expo бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео [One More Shutdown Next Year][SMRT] R151 (903/904) from Tanah Merah to Expo

Recorded on 8 December 2025

-Train Details
R151 (903/904) (Batch 1)
Build By: Changchun Alstom Railway Vehicles Co. Ltd.
Year Build: 2024
Year Entered Service: 2025
Year Refurbished: N/A
Traction Control: SiC-VVVF (Alstom MITrac TC 1500)
Train Number: 102 → 902
Destination: Changi Airport

As the track works to connect the East Coast Integrated Depot to the East West Line and the new platforms at Tanah Merah have been completed, normal train services between Tampines and Bedok, as well as between Tanah Merah and Expo, will resume on 8 December 2025 instead of 9 December 2025.

With Shutdown 2 now completed, only one more Shutdown remains. Shutdown 3(SD3), scheduled to take place in the first half of 2026, will disconnect Changi Depot(CHD) from the East West Line. After SD3, CHD will be decommissioned and subsequently demolished.

For any enquire you can send me an email:
[email protected]

Follow me on Instagram:
  / singapore_trains_channel  

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]