FastPatch - Ankeny Airport - Runway Repairs

Описание к видео FastPatch - Ankeny Airport - Runway Repairs

Ankeny Airport turned to FastPatch 5000 for a simple, long lasting solution to fix concrete spalling. In roughly 2 hours, both runways were closed, repairs prepped, FastPatch 5000 mixed, and installed. Under 60 minute cure time in 70F weather. Overall, this repair really "flew by!" (Pun intended)

Ankeny Airport - Owner
McClure Engineering - Engineer
Exec 1 Aviation - Installer
Coleman Moore Company - Distributor
FastPatch / Wilvaco - Manufacturer