Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть Outdoor Terminations 13 8kv kV XLPE 500mm Cable

  • Electrical Works
  • 2023-04-28
  • 918
Outdoor Terminations 13 8kv kV  XLPE 500mm Cable
power cable termination13.8kv cable terminationcable ka termination kaise karte hai13.8 kv xlpe armoured cable terminationunderground cable termination11kv panjaheat shrink cable termination outdoorcable termination kaise kareOutdoor Terminations 13 8kv kV XLPE 500mm CableXLPE 500mm Cableelectrical workselectrical wiringelectrical engineeringelectrical engineering basicswiring an outletcable size calculation
  • ok logo

Скачать Outdoor Terminations 13 8kv kV XLPE 500mm Cable бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно Outdoor Terminations 13 8kv kV XLPE 500mm Cable или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку Outdoor Terminations 13 8kv kV XLPE 500mm Cable бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео Outdoor Terminations 13 8kv kV XLPE 500mm Cable

Hi, thanks for watching our video about Outdoor Terminations 13 8kv kV XLPE 500mm Cable.
Outdoor cable terminations are commonly referred to as Pole Terminations – the following image shows the typical pole termination arrangement.

Prior to installation of the cable termination the following points should be observed by the cable jointers:

Construct the crucifix and fix to the final position on the pole
Ensure 33kV cable is positioned correctly at the pole base directly under in its position
Check phasing any crossing of the core is to be undertaken below the cable cleats
Position the 13.8kV cable in line with the crucifix and clamp the cable into the cleat
Straighten and position each core to its correct connection point
Procedure to install the pole termination.

In this video we’ll walk you through: overhead line installation
ABOUT OUR CHANNEL
Our channel is about Electrical Works. We cover lots of cool stuff such as Underground Cable , Overhead line and Electrical system
Check out our channel here:


/ @electricalworks852
Don’t forget to subscribe!

CHECK OUT OUR OTHER VIDEOS

   • Видео  



   • meter connection || 400volt line  

FOLLOW US ON SOCIAL
Get updates or reach out to Get updates on our Social Media Profiles!
Tiktok:   / electricalworks1  
Facebook:   / electricalwo.  .
Instagram:   / electricalw.  .

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]