MR-1 CNC Mill Assembly Tutorial: Performing Checklist Before Pouring Concrete Base (Revised)

Описание к видео MR-1 CNC Mill Assembly Tutorial: Performing Checklist Before Pouring Concrete Base (Revised)

In this video we highlight the six important checklist items that need to be verified prior to pouring your concrete base. For more information regarding the complete assembly steps for MR-1 Version 2, please refer to our online Assembly Manual.

To learn more about the Concrete Base design on MR-1, please check out the article on our website: https://www.langmuirsystems.com/mr1/base

0:00 - Intro
0:16 - #1 Y-axis Rail Mount Orientations
1:19 - #2 Verify Chip Tray is Level
2:26 - #3 Temporary Tray Support is Installed
3:08 - #4 Inspect Y-axis Rail Stiffeners
4:06 - #5 Verify Position of Rails & Mounts
6:30 - #6 Tape Legacy Drain Holes