DEMOLISHING WALL SPACE FOR STEEL BEAMS
EXISTING DRAINAGE TO BE RELOCATED
USING ACRO PROPS TO SUPPORT THE UPPER FLOOR
STRUCTURAL PROPPING TO SUPPORT 1ST FLOOR LOAD-BEARING WALLS
CENTRAL LOAD-BEARING WALL TO BE REMOVED
BRINGING IN NEW STEEL BEAMS
TWO ACCURATELY ADJUSTED AND PREPARING THE THIRD ONE FOR LIFTING
DW9 STEEL REINFORCEMENT MESH INSTALLED WRAPPED AROUND GROUND BEAM
LIFTING STEEL BEAM SAFELY
STEEL BEAMS PROPERLY SECURED AND ACCURATELY MEASURED
CENTRAL HEATING PIPES TO BE REMOVED AND REPOSITIONED AFTER STEEL BEAM INSTALLED
CASTING CONCRETE TO WRAP GROUND BEAM OF RSJ STEEL BOX FRAME
FIREPROOF PLASTERBOARD COVERING BEAM