Installing 13 Miles of Drainage Tile on the Farm!

Описание к видео Installing 13 Miles of Drainage Tile on the Farm!

Installing 70K ft of Drainage Tile! Last video we finished installing on the Mains, and this video we're installing all of the laterals which run up and down the field and dump into the 8 inch main. The 8 inch main dumps into the creek next to the field. From start to finish this project took us 7 full days. Was super rewarding, and excited to see the results come growing season! This will make a drastic improvement to this farm. Most of these soils have potential but we're limited due to heavy soil with a high water table. Thank for watching! S/O to Ben, Dad, Spencer & Buch for helping! Took a lot of labor!

These are the TapTees we were using (not paid or sponsored)- https://www.flextaps.com/

Instagram- https://www.instagram.com/thesquad_yo...

Комментарии

Информация по комментариям в разработке