Logo video2dn
  • Сохранить видео с ютуба
  • Категории
    • Музыка
    • Кино и Анимация
    • Автомобили
    • Животные
    • Спорт
    • Путешествия
    • Игры
    • Люди и Блоги
    • Юмор
    • Развлечения
    • Новости и Политика
    • Howto и Стиль
    • Diy своими руками
    • Образование
    • Наука и Технологии
    • Некоммерческие Организации
  • О сайте

Скачать или смотреть 2015 Project of the Year Runner-up - Boeing Winnipeg - Site Consolidation: Saskatchewan Exit

  • PMIManitoba
  • 2015-02-10
  • 350
2015 Project of the Year Runner-up - Boeing Winnipeg - Site Consolidation: Saskatchewan Exit
Boeing CanadaBoeing WinnipegPMIProject ManagementProject ManagerProject Management Institute (Organization)Manitoba (Canadian Province)Canada (Country)Boeing (Spacecraft Manufacturer)Winnipeg (City/Town/Village)Project (Quotation Subject)
  • ok logo

Скачать 2015 Project of the Year Runner-up - Boeing Winnipeg - Site Consolidation: Saskatchewan Exit бесплатно в качестве 4к (2к / 1080p)

У нас вы можете скачать бесплатно 2015 Project of the Year Runner-up - Boeing Winnipeg - Site Consolidation: Saskatchewan Exit или посмотреть видео с ютуба в максимальном доступном качестве.

Для скачивания выберите вариант из формы ниже:

  • Информация по загрузке:

Cкачать музыку 2015 Project of the Year Runner-up - Boeing Winnipeg - Site Consolidation: Saskatchewan Exit бесплатно в формате MP3:

Если иконки загрузки не отобразились, ПОЖАЛУЙСТА, НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если у вас возникли трудности с загрузкой, пожалуйста, свяжитесь с нами по контактам, указанным в нижней части страницы.
Спасибо за использование сервиса video2dn.com

Описание к видео 2015 Project of the Year Runner-up - Boeing Winnipeg - Site Consolidation: Saskatchewan Exit

Boeing Winnipeg’s overall divisional strategy was to consolidate their manufacturing operations into one factory and eliminate the need for leased facilities.

By having all of our team members consolidated into one location achieves several objectives:
Saves money from the cost of leasing, securing and cleaning two extra buildings.
Reduces the potential risk of damage to parts as they are transported back and forth between sites.
Improves our workflow and ability to communicate with each other by being in one building.
Saves time for those team members who have to travel between sites for their work.

At the start of this project, Boeing Winnipeg’s manufacturing operations were split into 3 separate factories; Murray Park drive (main factory), Redwood Ave (leased facility), and Saskatchewan Ave (leased facility).

The scope of this project was to clear out, restore and close the 113,000sqft Saskatchewan Ave leased facility, by relocating operations to the remaining two factories and transferring operations out to Boeing composite suppliers prior to the lease expiry on June 30th, 2014.

Комментарии

Информация по комментариям в разработке

Похожие видео

  • О нас
  • Контакты
  • Отказ от ответственности - Disclaimer
  • Условия использования сайта - TOS
  • Политика конфиденциальности

video2dn Copyright © 2023 - 2025

Контакты для правообладателей [email protected]