Lowrance Elite Ti2 detailed installation

Описание к видео Lowrance Elite Ti2 detailed installation

Will Davis from Grift co. talks through the process of fitting two Elite9 Ti2s to his project tinnie.

👇🏼🧾🕐Timestamps for all the installation steps are listed below 🕐🧾👇🏼

Timestamps:
1:00 - Unboxing
3:57 - Disconnecting Battery
5:07 - Removing Old Sounder
7:30 - Placement of a New Sounder
9:58 - Planning wiring Sequence
11:52 - Drilling holes for cable routing
13:40 - Routing Transducer Cable
15:20 - Mounting Brackets to Transducer
17:48 - Mounting transducer to hull
17:56 - Connecting Blade fuse to power cable (before I feed the cable through)
22:03 - Re-wiring the blade fuse so we can fit everything through the routing holes
22:52 - Connecting power cables to BUS Bar / Switch Panel
24:25 - Initialising power to the cables
25:30 - Quick tips for plugging cables into the MFD (Multi Function Display)
26:47 - Powering up for the first time!

Комментарии

Информация по комментариям в разработке