Point Motor & Control Panel Switch Installation Part 2

Описание к видео Point Motor & Control Panel Switch Installation Part 2

Welcome to Barnabas Junction.

Part 2 of 2 - In this 2nd Part I show the point motor installation, wiring them up and then connecting to the control panel for operation.

This is a very delicate procedure, drilling up through the baseboard and not cause any damage to the already fitted & ballasted point.

The point motors being fitted are Gaugemaster PM-2.

N.B. This setup is my way on how to simply operate insulfrog points.

Again would like to extend my many thanks to Jamie at Pennyhill Junction (http://bit.ly/2k7o2ep) for the help with the superb control panel track plan and also Garry at Cheekytek (http://bit.ly/2BCU76k) for the excellent technical advice with the wiring of the switches and point motors.

I hope you enjoy watching.

Please Like, Share, Comment & Subscribe.

Комментарии

Информация по комментариям в разработке