Building the V236-15.0 MW™ offshore turbine prototype | Episode 3: The Installation

Описание к видео Building the V236-15.0 MW™ offshore turbine prototype | Episode 3: The Installation

In a mini-series, we have invited people behind the scenes and into the factories to follow the process of bringing the turbine to life. In the final episode, we showcase the impressive work of transporting and installing the prototype.
Find out more about the V236-15.0 MW™ ➡️ https://fcld.ly/jiljyc4

Комментарии

Информация по комментариям в разработке