TRAINING | PERI TRIO assembly of stopend formwork (EN)

Описание к видео TRAINING | PERI TRIO assembly of stopend formwork (EN)

Stopend formwork can traditionally be realized with timber and TRIO Filler Support, Waler 85, Stopend Tie and Top Tie Bracket. For this, Stopend Ties are mounted first, then the Waler 85 is installed and locked in place by means of Wingnut Pivot Plates. Subsequently, the Top Tie Brackets are mounted using Tie Rods and Wingnut Pivot Plates.

Visit our YouTube channel:
   / perigroup  

Corporate Website:
https://www.peri.com

Facebook:
  / peri  

LinkedIn:
  / peri  

Instagram:
  / pericorporate  

Twitter:
  / perigroup  

The user shall always observe the currently valid Assembly and Use Instructions of the PERI products used by him/her:
https://www.peri.com/en/terms-of-use....

Комментарии

Информация по комментариям в разработке