4K 加拿大蒙特利尔尚普兰桥空拍 2024 Champlain Bridge Montreal Drone

Описание к видео 4K 加拿大蒙特利尔尚普兰桥空拍 2024 Champlain Bridge Montreal Drone

4K
加拿大蒙特利尔尚普兰桥
The Champlain Bridge of Montreal

The cable-stayed Champlain Bridge links Montreal Island and South Shore over the St Lawrence River
斜拉桥尚普兰大桥横跨圣劳伦斯河,连接蒙特利尔岛和南岸

Design by architect Poul Ove Jensen/ Built to replace the original Champlain Bridge
由建筑师 Poul Ove Jensen 设计/建造以取代原尚普兰大桥

The original 57-year-old Champlain Bridge has been demolished
原有 57 年历史的尚普兰大桥已被拆除

It is the widest (60m) cable-stayed bridge in the world that uses two planes of cables
它是世界上最宽(60 米)的斜拉桥,使用两层电缆

It is one of the largest infra projects ever built in North America
它是北美有史以来最大的基础设施项目之一

And the busiest crossings bridge in Canada with about 59 million vehicles a year
也是加拿大最繁忙的过境桥,每年约有 5900 万辆汽车通过

It is built to last 125 years with the usage of stainless steel and high-performance concrete
它采用不锈钢和高性能混凝土建造,使用寿命为 125 年

The asymmetric cable-stayed bridge is with a 240-metre main span, a 168-metre-high concrete tower
这座不对称斜拉桥的主跨度为 240 米,混凝土塔高 168 米

The bridge carries eight lanes of automobile traffic of the A-10,15, 20,
这座桥有八条车道, A-10、15、20 号公路通过此桥

With one lane in each direction dedicated for buses
每个方向都有一条专用于公交车的车道

It also includes a multi-use lane for cyclists and pedestrians
它还包括一条供自行车和行人使用的多用途车道

The central of the bridge deck carrys the automated light rail system(REM)
中央桥面承载着自动轻轨系统 (REM)

The bridge was built as part of a larger $4 billion project
这座桥是 40 亿美元大型项目的一部分

Комментарии

Информация по комментариям в разработке