Solar Kiln Finished (Part 7) // E120

Описание к видео Solar Kiln Finished (Part 7) // E120

In this episode we finish the construction on our new solar kiln building. The electric and water lines are run, and the fans are installed in the ridge area of the building. Meg finishes painting and caulking the structure and Jon adds the ridge cap at the top of the roof.

Episode 120:
0:00 - Creating a water bar
10:04 - Trench digging with RK24
13:58 - Running electrical and water lines
29:05 - Installing the new water spigot
33:22 - Installing the ridge cap
47:33 - Splitting an existing spigot
52:35 - Adding purlins to the tin roof
63:17 - Adding the fan wall
74:32 - Electric install for the fans
83:10 - Outtakes