BASE Parachute Packing #2 by Apex BASE

Описание к видео BASE Parachute Packing #2 by Apex BASE

This video provides instruction on how to pack your BASE parachute and is part two of a two part video. The first section is available here:

   • BASE Parachute Packing #1 by Apex BASE  

And covers:

1. A thorough line continuity check.
2. 3-ring assembly.
3. Bridle-to-canopy assembly.
4. PC-to-bridle assembly.
5. A complete slider-up pack job.

This second part covers:

1. The slider-off packing variation.
2. Tail gate installation.
3. Two different variations when dressing the nose.
4. Direct slider control (when slider up).
5. Two different stabilizer variations.
6. Setting up for a handheld jump.
7. Switching from one PC to another.
8. Slider removal and installation.
9. WLO Toggle installation.
10. Dual through loop closing variation.

These videos can also be found here: https://apexbase.com/packing-your-bas...
For more educational BASE info check out www.apexbase.com

Комментарии

Информация по комментариям в разработке