OC Transpo Transitway Bus Action in the Downtown Core - Final Days in October 2019

Описание к видео OC Transpo Transitway Bus Action in the Downtown Core - Final Days in October 2019

On September 14, 2019, LRT O-Train Line 1 (Confederation Line) opened for revenue service, replacing the existing Transitway network between Blair and Tunney's Pasture, and the buses operating in the Downtown core on MacKenzie King Bridge (to service Rideau Cenre) and along Albert St (westbound traffic flow) and Slater St (eastbound traffic flow).

The existing bus network continued to operate in parallel between September 14, 2019 and October 5, 2019.

This is a compilation video of of the bus action (Transitway service) in the Downtown Core in early October 2019 during its final days under the old bus network.

Timestamp:
0:00:00 Intro
0:00:11 Slater @ Kent
0:07:03 Slater @ Bank
0:15:43 Slater @ Metcalfe
0:25:36 Albert @ Metcalfe
0:43:31 Albert @ Bank
0:57:25 Albert @ Kent
1:04:57 MacKenzie King Bridge

Filmed by "JCL"
#octranspo

Комментарии

Информация по комментариям в разработке