Building A Rock Armored Trail to Bridge Across Soft Soil - Route 301 ep. 3

Описание к видео Building A Rock Armored Trail to Bridge Across Soft Soil - Route 301 ep. 3

Wrapping up the trail building for the 2021 season. This was filmed at the end of last year right before I headed out on road trip. To make this trail operational we built a segment that would bring us back the access road. Unfortunately at the time of filming it was too soft to ride and we wouldn't resume building on this trail until 8-9 months later once we had completed a few other projects. Those videos have already been posted.

Ep. 1 - The Start of the Trail Build    • "Route 301" - Breaking Ground On Our ...  
Ep. 2 - Building a Small Catch Berm    • Building a Tiny Catch Berm - Route 30...  
Ep. 3 - [This video]    • Building A Rock Armored Trail to Brid...  
Ep. 4 - Bench Cutting the Start    • Bench Cutting the Start of Our Trail ...  
Ep. 5 - Building a Creek Crossing    • Backyard Creek Crossing: The Most Cha...  
Ep. 6 - Linking up Two Creek Crossing    • Transforming Our Backyard Into a Moun...  
Ep. 7 - Most Frustrating 50 ft of Trail    • So Many Rocks - The Most Frustrating ...  
Ep. 8 - Taking Down A Big Hemlock    • Moving Logs Out Of the Woods To Have ...  
Ep. 9 - Building the Last feature    • Our Backyard Trail Is Finally Finishe...  
Full Playlist    • "Route 301" Backyard Trail Build  
If you're wondering why it's called route 301, it was the first trail I built start to finish with my mini excavator and what I credit for learning to trail build

Комментарии

Информация по комментариям в разработке