Metro Manila Skyway Stage 3 update as of December 2017

Описание к видео Metro Manila Skyway Stage 3 update as of December 2017

Well advance merry Christmas to all, 2017 is almost over in coming weeks. So this is what Skyway stage 3 so far looks like.

Section 1
Only Piers 13 to 21 along Flyover of Buendia still no girders
I guess all pier heads are complete in the flyover area
Along the stretch of Osmena hwy near the Zobel Roxas intersection Pier 49 - girders are being installed
drain pipes were installed on most piers around this stretch - great job beta team :-)
There are developments and soon new pier heads near Sunday machine shop / near the intesection of Quirino and Osmena hwy
We also showed the Quirino avenue area where a future on ramp or off ramp i am not sure will be placed.

Section 2
things are moving here.
new post are being erected and pier heads coming
Along N Domingo - the picture i added on the video last time was a dpwh project possibly in relation to the river area of skyway
an informer told me that there were surveying done along Panaderos and near Marketplace Mall

Section 3
From SM area to E Rod stretch most areas are now covered since girders were installed, there were some though without girders yet.
Not much changes along E Rod to Q Ave

Section 4
this area is getting busy, there were road closures and detour so chose your entry along Araneta avenue wisely... we did entered a detour area...
you could see the post for double deck and the part where the merging into double deck is.
The structures in Section 4 were different from the structures of the other sections.
No notable changes along Sgt Rivera stretch
Majority of the post had girders installed along A Bonifacio Avenue up to Ps4-128

Thank you for watching! Merry Christmas and a happy new year!