EZ Style Cooler & Bottle Filler Combination Installation

Описание к видео EZ Style Cooler & Bottle Filler Combination Installation

(0:07) EZ with Bottle Filler Install
(0:11) STEP 1: Remove hanger bracket fastened to back of cooler by removing (1) screw.
(0:23) STEP 2: Mount the hanger bracket to wall. NOTE: Hanger bracket MUST be supported securely. Add fixture support carrier if wall will not provide adequate support. Anchor hanger securely to wall using all (6) 1/4" diameter mounting holes.
(0:30) STEP 3: Hang the cooler on the hanger bracket. Be certain the hanger bracket is engaged properly in the slots on the back of the cooler.
(0:40) STEP 4: Remove the (4) screws holding the lower front panel at the bottom of cooler.
(0:50) STEP 5: Remove the front panel by pulling straight down and set panel aside.
(0:57) STEP 6: USING (2) 7/16" BOLT HOLES AND SCREWS (NOT PROVIDED ), FASTEN UNIT TO WALL.
(1:03) STEP 7: RECOMMENDED WATER SUPPLY LOCATION 3/8 O.D. UNPLATED COPPER TUBE CONNECTS STUB WITH SHUT OFF (BY OTHERS) 3".
(1:09) STEP 8: Remove the slip nut and gasket from the trap and install them on the cooler waste line, making sure that the end of the waste line fits into the trap. Assemble the slip nut and gasket to the trap and tighten securely.
(1:17) STEP 9: Using 5/32" Allen wrench remove (2) mounting screws holding top cover to bottle filler. Remove top cover. NOTE: Do not discard mounting screws, they will be needed to reinstall top cover.
(1:27) STEP 10: Remove wall mounting plate from bottle filler. Place wall plate against wall on top of basin. Center the wall plate side to side with the basin.
(1:35) STEP 11: Mark the (6) mounting holes with a pencil. Remove wall mounting plate from wall. NOTE: Mounting plate MUST be supported securely. Add fixture support carrier if wall will not provide adequate support. Install wall mounting plate to wall using six (6) 7/16" obround mounting holes (mounting bolts not included). Use appropriate fasteners for your wall type.
(1:43) STEP 12: Feed power cord & and 3/8" water line through hole in tower/basin gasket. Install gasket on bottom of bottle filler tower with gasket support bracket, (2) washers and (2) screws.
(1:45) STEP 13: Fish the power cord and waterline through the hole on top of water cooler. NOTE: To prevent scratching the basin, place a towel or soft cloth over the entire basin when working above it. Fish the purple wire (single units) or the purple and yellow wires (bi-level units) up through basin hole & and hole in gasket.
(2:06) STEP 14: With the power cord, wire(s), and water line through hole on top of water cooler place bottle filler on the (3) angled tabs protruding from the wall mounting plate, installed on wall. Make sure round boss in gasket fits in hole of basin.
(2:12) STEP 15: For single model installations: Attach the purple wire from cooler to the purple wire on the back of the unit. NOTE: Yellow wire is not used. For bi-level model installations: Attach the purple and yellow wires from coolers to the purple and yellow wires on the back of the unit; purple to purple and yellow to yellow.
(2:21) STEP 16: Once bottle filler is installed on wall plate tabs, and the water line, wire(s) and power cord are installed properly, push top of bottle filler toward wall and line up top cover (2) holes.
(2:30) STEP 17: Reinstall top cover on bottle filler with (2) mounting screws from step 11 above. Caution, do not over tighten screws.
(2:41) STEP 18: Install remaining tube insulation to the water line from bottle filler. Connect bottle filler water line inside of the water cooler by connecting the 3/8" water line to the tee.
(2:50) STEP 19: Turn on water supply to unit.
(2:57) STEP 20: Inspect for leaks. Fix all leaks before continuing.
(3:04) STEP 21: Once any leaks found have been corrected, plug bottle filler and unit into wall. Be sure to reinstall fuse to the circuit or switch the circuit breaker back to the “ON” position.
(3:13) STEP 22: Verify proper dispensing by placing cup, hand, or any opaque object in front of sensor area and verify water dispenses. NOTE: The first initial dispenses might have air in line which may cause a sputter. This will be eliminated once all air is purged from the line.
(3:23) STEP 23: Stream height is factory set at 35 PSI. If supply pressure varies greatly from this, adjust screw located on the left side below push bar assembly on crossbar. Clockwise adjustment will raise stream and Counterclockwise adjustment will lower stream. For best adjustment, stream should hit basin approximately 6-1/2" (165 mm) from bubbler on the downward slope of the basin. NOTE: If continuous flow occurs at the end of the compressor cycle, turn cold control counterclockwise 1/4 turn.
(3:33) STEP 24: Once unit tests out, replace lower panel back on water cooler(s).
(3:42) STEP 25: Replace the (4) screws holding the lower front panel at the bottom of cooler.
(3:51) Installation is complete.

Комментарии

Информация по комментариям в разработке