Estimation using Centerline Method (Part 2) of residential building

Описание к видео Estimation using Centerline Method (Part 2) of residential building

In this part quantities of Earthwork in excavation, bed concrete in foundation, foundation, Damp proof course, brickwork in superstructure, lintel and roof slab has been shown in detail, plan consists of two different wall sections, 30cm wall which is main wall and 20cm wall known as partition wall, so how to tackle problem when theere are two sections is shown in this video.
As video would get longer so we have stopped till roof slab, Part 3 will cover remaining quantities of the residential building.

Estimation using Centerline Method Part 1 :    • Estimation using Center Line Method (...  

Estimation by LongWall Short Wall Method :    • Long Wall Short Wall Method | Estimat...  

My Phone : https://amzn.to/311uFDW
Amazon Basics 50-Inch Lightweight Tripod with Bag : https://amzn.to/3ayCdkG
Laptop : https://amzn.to/3hi2yGp
Estimating and Costing by B.N.Dutta : https://amzn.to/2Eanu3c
Estimating and Costing by Rangwala : https://amzn.to/31X7gTi

#centerlinemethod #estimationofbuilding

Комментарии

Информация по комментариям в разработке