MBTA East Route Main Line 1997 Part 1

Описание к видео MBTA East Route Main Line 1997 Part 1

MBTA Commuter Rail East Route Main Line, 1997.

Cab ride by Director and Deputy Director of Commuter Rail, joined by Neil Chayet.

Engineer is Alan MacMillan.

Purpose of trip was to meet the ADtranz Flexliner DMU, which was being tested for two months on the MBTA Commuter Rail System.

Journey begins in Boston at North Station.

Комментарии

Информация по комментариям в разработке