Rigging Shrouds Part 3 - HMS Sphinx (Vanguard Models) - Model Boats

Описание к видео Rigging Shrouds Part 3 - HMS Sphinx (Vanguard Models) - Model Boats

I have created 4 videos showing the method I am currently using to rig the shroud lines on my HMS Sphinx model boat. This is the third video in the series. My build log for this model can be found at:

https://modelshipworld.com/topic/3021...

In this video I am adding the two seizing's to the shroud line.

With the deadeye held in one of the quad hands a 20cm length of 0.1mm natural thread is used for the seizing. Starting with the lower seizing a half hitch knot is tied to the rear of the shroud line and it's position is checked using a piece of 2mm tape. As can be seen in the video the position of the knot is adjusted. Another half hitch is then tied to the front of the shroud. As the seizing moved slightly when adding the front half hitch knot it was rechecked with the tape and moved the seizing back to the correct position.

It was then a case of adding 8 more half hitches, 4 to the rear and 4 to the front. A touch a ca gel was used to secure the last half hitch and the excess thread trimmed.

The second seizing was a simply a repeat of the first. A 20cm length of natural thread was used for the seizing and once its initial position was checked using a piece of 2mm tape it was then a case of adding the sequence of front and rear half hitches, 10 in total.

Комментарии

Информация по комментариям в разработке